中文字幕第一页在线无码_成人免费毛片在线观看_亚洲一区无码中文字幕乱码_欧美国产日韩久久mv

Anchor bolt

Home > Products > Anchor bolt
Hook bolt

CATEGORY:Hook bolt

+86-310 - 6880555 Order

Product details

1. One time embedding method: When pouring concrete, embed the hook bolt. When the tower is controlled by overturning, the hook bolt should be buried in one go.
2. Reserved hole method: The equipment is in place, the holes are cleaned, the hook bolt are placed in the holes, the equipment is positioned and aligned, and then non shrinkage fine aggregate concrete one level higher than the original foundation is poured and compacted. The distance from the center of the buried hook bolt to the edge of the foundation should not be less than 2d (d is the diameter of the hook bolt), and should not be less than 15mm (when d ≤ 20, it should not be less than 10mm), and should not be less than half of the width of the anchor plate plus 50mm. When the above requirements cannot be met, appropriate measures should be taken to strengthen it. The diameter of the hook bolt used in the structure should not be less than 20mm. When subjected to earthquake action, double nuts should be used for fixation, or other effective measures should be taken to prevent loosening, but the anchorage length of the hook bolt should be increased by 5 days compared to the anchorage length under non earthquake action.
The installation plan of hook bolt: Treatment of loose hook bolt in the foundation. When tightening the hook bolt, the bolts may be pulled out. At this time, the bolts should be adjusted to their original position first, and the foundation around the bolts should be excavated enough. Then, two U-shaped steel bars should be welded vertically and horizontally on the bolts. Finally, the pit should be cleaned with water and grouted. After the concrete solidifies to the design strength, the deviation of the hook bolt can be tightened. The treatment method for deviation of the hook bolt is roughly the same as that for dead hook bolt, except that the hook bolt can be pulled out for treatment. If the bolt is too long, a section can be cut off on the machine tool and threaded again; If the bolt is too short, it can be extended by hot forging method; If the position does not match, use the bending method to correct it.
Application industry: Suitable for various equipment fixation, steel structure foundation embedded parts, street lights, traffic signs, pump, boiler installation, heavy equipment embedded fixation, etc.

Related products

  • L Bolt
    L Bolt

    1. One time embedding method: When pouring concrete, embed the L bolt. When the tower is controlled ...

    View more
  • Hook bolt
    Hook bolt

    1. One time embedding method: When pouring concrete, embed the hook bolt. When the tower is controll...

    View more
  • Hook bolt
    Hook bolt

    1. One time embedding method: When pouring concrete, embed the hook bolt. When the tower is controll...

    View more

Prev:No more

Next:Hook bolt

景德镇市| 观塘区| 铜鼓县| 东港市| 莫力| 墨竹工卡县| 河间市| 团风县| 布尔津县| 甘洛县| 阳江市| 佛冈县| 佛山市| 新兴县| 安徽省| 中宁县| 普格县| 屏东市| 赤水市| 拉萨市| 长岭县| 洞头县| 商丘市| 涿鹿县| 喀什市| 巫山县| 望谟县| 稷山县| 永靖县| 且末县| 冷水江市| 顺义区| 景德镇市| 凤庆县| 锡林浩特市| 阜康市| 镇雄县| 获嘉县| 志丹县| 肇源县| 安多县|